Design-Build Biological Treatment for Kerry Ingredients

Design Build Biological Treatment Plant

ISC constructed a new design build aerobic treatment plant for Kerry Ingredients at their existing flavorings manufacturing facility in Savannah, Georgia.  The system was constructed to remove BOD, TSS and Oil/Grease using a two stage DAF system with a Moving Bed Biofilm Reactor (MBBR). 

Integral Components:

  • Influent Pump Station
  • New Treatment Building
  • Solids Screening
  • 32’ x 28’ Equalization Tank
  • Aeration Mixing System
  • Odor Control System
  • 12’ Dia Diversion Tank
  • Primary Dissolved Air Flotation
  • Chemical Storage Tanks
  • Chemical Feed System(s)
  • 26’ x 24’ MBBR Reactor Tank
  • Aerated Coarse Bubble Diffusion
  • Secondary Dissolved Air Flotation
  • 15’ x 18’ Sludge Storage Tank
  • pH Control System
  • Effluent Pump Station

Project Brochure

Biological Treatment Photo Gallery

Featured Projects

Design Build Biological Treatment for Frito-Lay
Design-Build Biological Treatment for Kerry Ingredients
Design Build Biological Treatment for Darling International